Tags

, , , ,

Yesterday we worked on building the frame, fiberglassing the frame, and running all the wire inside the bus. We worked in pairs, Charlie and Ed working on the frame, me and Durty working on the electric. We got a lot done, but we still have so much more to do so today we will continue on

116 114

Jak and Charlie checking to see how the frame fits on the top of the bus

109 112 111

electric outlets and conduit cut and put together and ready to go

123 122

Lauren working on drawings/plans for the boxes which we will put over the veggie tanks and the opposite side to make a kitchen and then also will make an extra place to sleep.

120 127 128

Durty working on the electric. The conduit up, the outlets in and the wire through

126 137 138 139

It took us all day to finally make it to this point, everything ready to be hooked up to the batteries and solar ; )

133 132 131 130 129

Ed and Charlie working together to fiberglass the frame. A messy smelly long process.

Advertisements